Decentralized Fuzzy P-hub Centre Problem: Extended Model and Genetic Algorithms

Message:
Abstract:

This paper studies the uncapacitated P-hub center problem in a network under decentralized management assuming time as a fuzzy variable. In this network, transport companies act independently, each company makes its route choices according to its own criteria. In this model, time is presented by triangular fuzzy number and used to calculate the fraction of users that probably choose hub routes instead of direct routes. To solve the problem, two genetic algorithms are proposed. The computational results compared with LINGO indicate that the proposed algorithm solves large-scale instances within promising computational time and outperforms LINGO in terms of solution quality.

Language:
English
Published:
International Journal of Supply and Operations Management, Volume:4 Issue: 1, Winter 2016
Pages:
90 to 104
magiran.com/p2044989  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!