DYNAMIC MODELING OF CONSTRUCTION PROJECTS' LABOR NEED

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

Human resource management is regarded as a fundamental process for effective labor application to ensure desired performance in the project. The project goals are met only through human resource management, and the project success relies on it. Construction is a labor-intensive industry that heavily depends on human resources. Moreover, construction projects are naturally complex and dynamics. One of the effective human resource management practices that greatly affects the project workflow and progress is to obtain required labor. System dynamics is applied to model the labor requirements of the construction projects', considering project dynamics. System dynamics is used as a research tool to provide useful insights for human resource planners to ensure that the project will be delivered on time and within the budget. The labor need of the construction projects is investigated based on project progress. A causal loop diagram is obtained, and the Stock-Flow model is developed for estimating the labor need of the construction projects. The proposed model consists of subsystems including the human resources, project workflow, project performance indexes, and policies. The required data are collected for a housing project executed in Iran. Finally, the dynamic model of the labor need of construction projects is built. The model has been validated using standard testing methods of system dynamics models. Simulation results show that the required labor in construction projects has fluctuations over time. These fluctuations affect the labor supplying process. Two policies have been proposed to reduce the fluctuations of the labor need of construction projects including hiring policy at different times and employment of different groups of the labor in terms of experience and skills. Although both policies improve the system, each one of them has different effects on project performance. By using the model, the required labor based on project progress can be determined. The opportunity can be given to decision-makers to plan for timely supply of project labor.

Language:
Persian
Published:
Sharif Journal Civil Engineering, Volume:35 Issue: 2, 2019
Pages:
69 to 79
magiran.com/p2048465  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!