Factors Affecting Engineering, Procurement and Construction Contracts in Power Transmission Projects

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

In Iran, the electricity industry is considered as one of the underlying industries in the development of the country with the supply of electrical energy needed by the industry and the people consuming it. In line with this, a large number of national large scale projects are implemented annually to transfer electricity across the country. Therefore, identifying and prioritizing the factors affecting electricity transmission projects in the country is mainly a serious and multi-criteria issue and is of strategic importance for the Iranian electricity industry. Therefore, the main purpose of this paper is to identify and prioritize the influential factors on EPC contracts of multi-criteria decision making and hierarchical analytical process modeling of the countrychr('39')s electricity transmission projects. Using the results of the present study, we propose practical solutions.

Language:
Persian
Published:
Iranina journal of Energy, Volume:22 Issue: 4, 2020
Pages:
153 to 180
magiran.com/p2177575  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!