Optimizing the lift process in high-rise construction projects
The availability of resources such as workforce and materials at each level of a high-rise construction project just before the commencement of building tasks is a crucial issue that might have direct impacts on project progress. To avoid delays caused by lack of human resources and construction materials, a construction management team always tries to find a better way to facilitate supply chain process specifically for construction projects facing a significant number of simultaneous and repetitive tasks. The other challenge in a high-rise construction project is vertical transportation that requires detailed machinery e.g. cranes or lifts, and maximizing their utilities is another challenge. In this paper, we tried to automate vertical transportation planning process in high-rise construction projects by introducing a platform that handles the entire lifting process. This platform considers (i) tasks attributes (e.g. required resources, location and commencement time) from the project schedule, (ii) lifting system specifications (e.g. travel speed, weight, and volume capacity) and (iii) project geometrics (e.g. current height of the project). In details, the introduced platform provides an optimized daily-based delivery plan by developing a Mixed-Integer Programming (MIP) model that covers workforce and construction materials. In this paper, we also test the proposed platform with field data obtained from a 34-story construction project in Mashhad, Iran. The model could find a solution with 0.000% optimality gap in approximately one hour, which is an acceptable amount of computational cost for the problem.
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.