A Novel Cell Layout Problem with Reliability and Stochastic Failures

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

The facility layout design and Cell Formation (CF) problems are the important sectors in designing a cellular manufacturing system (CMS). These problems are interrelated and simultaneous consideration of them is essential for a successful design of CMS. In this paper, a new non-linear mixed integer programming model is presented to solve the integrated cell formation and inter/intra cell layouts in continuous space. The proposed approach incorporated machine reliability with a stochastic time between failures. Some important factors such as stochastic process time, part demand, cell size, variable process routing, and both inter-cell and intra-cell layout are considered in proposed model. The objective is to minimize the total inter/intra cell transportation cost and total breakdown cost. The proposed model is then linearized to reduce computation time and an exact solver by using GAMS is proposed to tackle the computational complexity of the developed model. Results indicate the efficiency and the application of proposed model in the area of CMS conceptually

Language:
English
Published:
International Journal of Supply and Operations Management, Volume:8 Issue: 2, Spring 2021
Pages:
165 to 175
https://www.magiran.com/p2295784  
سامانه نویسندگان
  • Author (3)
    Reza Tavakkoli Moghaddam
    Professor School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
    Tavakkoli Moghaddam، Reza
  • Author (4)
    Hasan Hosseini Nasab
    Full Professor Yazd University, Industrial Engineering, Yazd University
    Hosseini Nasab، Hasan
اطلاعات نویسنده(گان) توسط ایشان ثبت و تکمیل شده‌است. برای مشاهده مشخصات و فهرست همه مطالب، صفحه رزومه را ببینید.
مقالات دیگری از این نویسنده (گان)