Economic Dispatch Problem for Minimizing Cost and Improving Reliability Consifering Uncertainty

Message:
Article Type:
Research/Original Article (بدون رتبه معتبر)
Abstract:
The purpose of the economic load distribution problem is to find a suitable design for the output of power plants in order to supply the consumption load in a certain time horizon, so that it ensures that the proposed design will meet the load demand at an acceptable level of reliability. With the advent of energy management and power consumption methods, the load growth trend has decreased, but there is still a need to optimize the issues of optimal operation in the production, transmission and distribution networks to supply and transfer power from producers to consumers. Therefore, solving the problem of economic load distribution in an optimal way and at an acceptable level of reliability is essential. The main purpose of this issue is to reduce operating costs. Operating costs include the cost of operating power plants and maintaining the network. In addition to cost, there are other goals such as network reliability that have not been carefully and seriously examined, so this article examines these goals. In this paper, a safe multi-objective optimization framework for dispatching power plants is presented. Cost minimization, redistributed energy were considered as optimization objective functions.
Language:
Persian
Published:
Journal of Southern Communication Engineering, Volume:11 Issue: 41, 2021
Pages:
77 to 91
https://www.magiran.com/p2414159  
سامانه نویسندگان
  • Author (2)
    Mojtaba Najafi
    Assistant Professor Electrical, Bushehr Branch, Islamic Azad University, Bushehr, Iran
    Najafi، Mojtaba
اطلاعات نویسنده(گان) توسط ایشان ثبت و تکمیل شده‌است. برای مشاهده مشخصات و فهرست همه مطالب، صفحه رزومه را ببینید.
مقالات دیگری از این نویسنده (گان)