Delay scheduling based on discrete-event simulation for construction projects
Following the increasing growth of urbanization in recent decades in Iran, housing has become one of the most critical issues in the country. In this regard, mass production of housing has received more attention, and residential complexes can be considered a physical manifestation of the idea of mass housing in cities. Operational efficiency in residential construction production systems is evaluated based on average house completion time, the number of houses under construction, and processing time of activities. However, these systems are prone to non-uniformity problems and suspensions resulting from different variables, such as adverse weather conditions, workplace accidents, fluctuations in house demand, and rework. The purpose of this research is to show the effect of reprocessing on the manufacturing process. In this study, the rework parameter and the variables of frequency, duration, and time of call-back have been considered. Also, the effects of these parameters on tangible performance criteria have been investigated. In this regard, we apply the combined approach of discrete-event simulation and computational modeling; then, we compare the results. Measurements show that the systems fragmented by repeated and short repetitions while referring to early are in optimal performance.
-
Decision Intelligence to Enhance Bank Profitability through Customer Promotion Path Design
Mohammadamin Adibi *,
Journal of Systems Thinking in Practice, Winter 2025 -
Risk Management of Outsourcing Projects in Auto Parts Manufacturing Companies by Using Failure Mode Analysis Method and Decision-Making Technique
Reza Khodayari, Mehdi Yazdani *, , Seyedeh Tannaz Salehan
Journal of system engineering and productivity, -
Modeling the positioning of support forces in future battles using data envelopment analysis and the principles of natural and managerial accessibility
, Hamid Bigdeli *, Nader Shamami
Journal Defensive Future Studies, -
Locating Routing Problem (LRP) of distribution of priority support items to ground forces in war conditions
, Hamid Bigdeli *, Nader Shamami
Engineering Management and Soft Computing,