Estimation of mining time-span to improve the solution time in long-term production planning
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Long-term production planning in open-pit mines is a precedence-constraint knapsack problem. A spatial representation of the mining region (called the block-model) is the primary input of mine planning models. One should note that as the number of blocks and periods to be planned increases, the number of decision variables increases. This paper presents a fast yet straightforward algorithm to reduce binary variables in open-pit mine production planning models. The algorithm considers mining capacity, processing capacity, and pit deepening rate to estimate the time span within which a block is mineable. This paper applies the algorithm in 12 different cases. The number of blocks varies from 1000 to 240000, and the mining periods range from 6 to 30 years. According to the results, this algorithm is helpful for problem size reduction.
Keywords:
Language:
English
Published:
International Journal of Mining & Geo-Engineering, Volume:56 Issue: 2, Spring 2022
Pages:
159 to 165
https://www.magiran.com/p2459225
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Greenhouse Gas Emissions Reduction through Integration of Renewable and Non-renewable Energy Sources: A Model for Sangan Iron Ore Mine Complex of Iran
H. Shahbakhsh, M. Osanloo *
International Journal of Engineering, Nov 2025 -
A Spatiotemporal Environmental Sustainability Assessment Model for Deep and Large-scale Open-pit Copper Mines
M. Heydari, M. Osanloo *
International Journal of Engineering, Apr 2025