Abstract:

Back-up locomotives are locomotives responsible for mechanized excavation of tunnels, transport of prefabricated concrete parts, slurry poured behind prefabricated concrete parts and foams, as well as materials excavated from the tunnel. In this study, the reliability, availability and maintainability of back-up locomotives of EPB-TBM machines of Tabriz metro line 1 have been investigated. Initially, locomotives were divided into four main systems, including pneumatic, electrical, hydraulic and motor. Each of these systems, in turn, consisted of subsystems. Then, the failure data of 5 locomotives were collected; after combining the data, about 30,000 hours of data were obtained from the failures. Examination of the data showed that there was a failure in ten subsystems and these subsystems were critical. Pareto analyzes were then performed to examine the percentage of failures, costs, and repair times. For each subsystem, the most appropriate failure distribution function was fitted and the reliability of the subsystems and systems was determined. Due to the lack of a trend in all failure data and the prevalence of independent and equal conditions for the data, reliability and availability were matched. Also, using the average repair times, the maintainability of the components was determined. The results indicated the importance of reliability for pneumatic, electrical, motor and hydraulic systems, respectively. Meanwhile, the pneumatic system is very different from the other three systems, and over time, this difference becomes even greater. Another very important result is the loss of reliability of almost all subsystems to below 50% after 500 hours of operation. In the maintenance section, the results also showed that all failure times were higher than 400 hours. In terms of repair times, a significant part was related to the hydraulic system, followed by the engine and pneumatic system with the most repair time.

Language:
Persian
Published:
Journal of Mining Engineering, Volume:17 Issue: 57, 2023
Pages:
68 to 88
magiran.com/p2517550  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!