Ranking criteria used for underground mining method selection applying Z-numbers Theory
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Due to its nature, mining operations are associated with many uncertainties. The effective factors in selecting the appropriate mining method in underground mines are also associated with uncertainties. The uncertainty associated with these parameters can cause various life-threatening/mortal and financial risks. Considering the risk and uncertainty related to these parameters, ranking and determining their importance, not only helps to choose the best (the safest and the most profitable) mining method before starting the mining process, but also to design a better and safer mine and reducing subsequent risks. Fuzzy parameters are generally estimated through expert knowledge, but the degree of confidence in the opinion of different experts is different and the uncertainty and difference in the reliability of their opinion cannot be ignored. In this research, Z-numbers Theory was used to solve the mentioned challenge. To conduct the present study, first the influencing factors in the selection of underground mining methods were studied and classified into 4 main groups of criteria, 13 sub-criteria 1 and 85 sub-criteria 2. Then, the Z-numbers theory was used to rank and determine their importance. After calculating the final weight of each parameter, in order to check the validity and accuracy of the findings, the results were compared with the parameters considered for choosing the underground mining method in Angouran mine. The results show that in each group of parameters, the more weighted factors (the results of the present research) correspond to the parameters related to choosing the mining method in Angouran mine.
Keywords:
Language:
Persian
Published:
Amirkabir Journal of Civil Engineering, Volume:45 Issue: 12, 2023
Pages:
4639 to 4656
https://www.magiran.com/p2556951
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Investigation and analysis of mining methods from the perspective of the ultimate limit determination requirement
Majid Ataee-Pour *, Zeinab Jahanbani, Mehrnoosh Heydari, Nima Karim, Golale Hosseini
Journal of Environment and Sustainable Mining, Winter 2025 -
Designing the ventilation system of tunnel No. 2 of the third section of the main road Pataveh-Dehdasht during utilization
Mohammadreza Bahmani, Hasan Madani *, Majid Ataee-Pour, Shabir Arshadnejad
Journal of Mining Engineering,