Designing of open-pit mines using new corrected form of the Korobov algorithm
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
In the open-pit mining method, it is necessary to design the ultimate pit limit before mining to determine issues, such as the amount of minable reserve, the amount of waste removal, the location of surface facilities, and production scheduling. If the obtained profit from the extraction of the pit limit becomes maximum, it is called the optimum pit limit. Various algorithms have been presented based on heuristic and mathematical logic for determining the optimum pit limit. Several algorithms, such as the floating cone algorithm and its corrected forms, the Korobov algorithm and its corrected form, dynamic programming 2D, the Lerchs and Grossmann algorithm based on graph theory have been presented to find out the optimum pit limit. Each of these algorithms has particular advantages and disadvantages. The designers of the corrected form of the Korobov algorithm claim that this algorithm can yield the true optimum pit in all cases. Investigation shows that this algorithm is incapable of yielding the true optimum conditions in all models, and in some models the method produces an optimum with a negative value. In this paper, this algorithm has been evaluated, and a modification model is also presented to overcome its disadvantage. This new algorithm was named the Korobov algorithm III. In this paper, this new algorithm was considered in different models of two and three-dimensional space. A case study for designing of the optimum pit limit in three-dimensional space was done for a gold mine in the sewed country. The outcomes of Table 9 show that this new method designs a pit limit with a value of 69428.59 that has better results than previous Korobov algorithms.
Keywords:
Language:
English
Published:
International Journal of Mining & Geo-Engineering, Volume:57 Issue: 2, Spring 2023
Pages:
123 to 130
https://www.magiran.com/p2588964
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Developing an empirical equation for estimating water flow in underground structures
S. Moshiri Aliabad, S. E. Jalali, M. Noroozi *
Tunneling&Underground Space Engineering, -
Phasing Optimization in the Single Helical Perforation Pattern in Hydrocarbon Reservoirs
Ali Sheikholeslam, Seyed Mohammadesmaiel Jalali *, Ahmad Ramezanzadeh, Hasan Shojaei
Petroleum Research, -
The Complete Model of Wet Air Analysis in Mine Ventilation Design (CMWAA Method)
Zeyni *, Farhang Sereshki, Reza Khaloo Kakaie
International Journal of Mining & Geo-Engineering, Winter 2024 -
Analyzing the effects of natural ventilation caused by excavating the waste pass on the ventilation network of Anguran mine
Majid Fetri, Reza Shakoor Shahabi *, Farhad Samimi Namin, Zeyni, MohamadHosein Khani Khereshki
International Journal of Mining & Geo-Engineering, Summer 2023