Presenting a multi-objective mathematical model with an integrated approach to scheduling and financial flow in production projects using NSGA-II
The current research aims to present a multi-objective mathematical model with an integrated approach to scheduling and financial flow in production projects using Non-dominated Sorting Genetic Algorithm II (NSGA-II).
This research presents a multi-objective mathematical model integrating scheduling and financial flow optimization in civil engineering projects. This research addresses the scheduling and financial flow challenges in construction companies' production projects. The objective is to develop a multi-objective mathematical model that integrates scheduling and financial considerations to optimize resource allocation and minimize costs. The statistical population is in the form of a case study, and the required information and data were collected through interviews with managers of Kisson Construction Company.
NSGA-II was used as an optimization algorithm to find efficient multi-objective solutions, and optimal results were presented to select civil and construction projects.
Originality/Value:
This research contributes to the field by proposing a novel multi-objective mathematical model that integrates scheduling and financial flow considerations in production projects. The use of the NSGA-II algorithm enhances the efficiency of finding optimal solutions. The findings can be valuable for decision-making when selecting construction and production projects.
-
Presenting the Structuring Model of Factors Affecting Traffic Management the Combined Performance of Soft Systems Methodology and Structural-Interpretive Analysis
Masoumeh Pourbaqer, Sayyed Mohammadreza Davoodi *, Pouria Farahgol
Journal of Transportation Research, Summer 2025 -
The Relationship Between Green Financing and Green Innovation: A Game Theory Approach to Companies' Risk-Taking Behavior
*, Mansour Abedian, Neda Kazemi
Journal of Green Development Management Studies, Winter and Spring 2025 -
Option Pricing Error: Evidence from Nonlinear Markets based on Probabilistic Neural Networks and Multilayer Perceptron
Mohammadhossein Seifi, Elham Dastranj *, Abdolmajid Abdolbaghi, Sanaz Lamei
Asset Management and Financing, -
An integrated multi-objective Model of scheduling and financial flow of production projects and useing of MOSA and MOKA meta-heuristic algorithms
S. Janbaz, S. M. R. Davoodi *, A. Abdolbaghi Ataabadi
Journal of Industrial Engineering Research in Production Systems,