Abstract:
Today, underground mining has a small share of mineral production worldwide. However, underground mining is expected to receive more attention soon due to the extraction of most surface deposits, increasing pit depth, and environmental issues. Stope boundary optimization (SBO), development network, and production scheduling are three main problems in underground mine planning, which are affected by numerous shortcomings and oversimplifications. To overcome one of these shortcomings, a new Integer Linear Programming (ILP) model has been introduced in this article to solve the SBO problem. The new proposed model guarantees an optimal solution and could accelerate problem-solving using an efficient variable reduction technique. Implementing the new proposed model on a hypothetical example and accurate data confirmed its ability to produce robust solutions in a reasonable computation time. We strongly believe that further improvement in the solving process is still possible by using variable reduction, decomposition methods, or relaxation techniques.
Keywords:
Language:
Persian
Published:
Journal of Mining Engineering, Volume:19 Issue: 65, Winter 2025
Pages:
18 to 38
https://www.magiran.com/p2865094
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Evaluation of the relationship between the government and contractors in the field of financial resources of mining projects using the Nash bargaining method
Amir Fazli Allah Abadi, *
Industrial Engineering & Management Sharif, -
Application of Keshtel Algorithm for Long Term Production Planning in Open Pit Mines
Sajjad Rostamian, Majid Ataee-Pour *, Zeinab Jahanbani
Amirkabir Journal of Civil Engineering,