Inspection of encountered water in power tunnel of Saymareh dam site, Ilam

Abstract:
Saymareh dam and hydro-power plant are under construction on Saymareh River in Ravandi anticline, Ilam province. During boring the power tunnel which crosses the anticline, a large volume of water was encountered. This volume of water was not observed in the past. Considering the water quality of springs, water level of dam site piezometers, geological and hydrogeological inspections, isotope analysis, tracing experiments and water balance, it was concluded that the main portion of water is not supplied by the Ravandi anticline. The neighboring Veizenhar, Gavar and Milleh anticlines contribute to providing the main body of water. The most probable paths of water are not cross the dam reservoir and a localized conduit flow is not established in this area. Therefore, water leakage from the reservoir is not expected.
Language:
Persian
Published:
Journal of Engineering Geology, Volume:2 Issue: 1, 2007
Page:
301
magiran.com/p800405  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!