Integration of project scheduling and equipment planning

Message:
Abstract:
Equipment planning and project scheduling are important issues project managers face and are considered key factors in the success or failure of a project. Research carried out on project scheduling indicates that equipment planning is usually disregarded, or the project is first scheduled, and equipment is planned based on the schedule obtained. This leads to a non-optimal project schedule. In this article, project scheduling and equipment planning are simultaneously considered, where genetic algorithm and simulated annealing are utilized to solve the developed mixed-integer-programming model in order to minimize the costs. To examine the efficiency of the proposed algorithms, problems with different number of activities and equipment were solved and compared based on the results obtained. The results show that the proposed algorithms are capable of solving problems with high number of nodes and variable complexities in a short CPU time.
Language:
Persian
Published:
Journal of Industrial Management Studies, Volume:12 Issue: 32, 2014
Pages:
21 to 47
magiran.com/p1363476  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!