Optimization of Bandarabbas Steam Power Plant Repowering Using Genetic Algorithm

Message:
Abstract:
In this study, after investigating different methods of repowering and considering technical conditions of a 320MW unit at Bandar Abbas steam power plant, full repowering method has been chosen for the power plant improvement. For this purpose, all the steam turbine extractions have to be removed and a heat recovery steam generator (HRSG) and two V94.3A gas turbines have to be used. The results obtained from the repowered plant simulation showed that due to repowering and optimization, exergy efficiency increases by about 53.99% and heat rate and exergy destruction ratio will decline by 29.27% and 36.07%, respectively.
Language:
Persian
Published:
Journal of Mechanical Engineering, Volume:44 Issue: 3, 2015
Pages:
53 to 62
magiran.com/p1414404  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!