Dual-objective Preemptive Multi-mode Resource-Constrained Project Scheduling Problem Optimization Model
Author(s):
Abstract:
The Multi-Mode Resource Constrains Project Scheduling Problem (MRCPSP) tries to find the best sequence of activities in a manner that involves more than one type of operating mode and in the presence of resource constraints, projects precedence constraints must be satisfied. In each execution mode, the amount of resources and execution time are specified and different. In The Preemptive multi-mode Resource Constraints Project Scheduling Problem (P-MRCPSP), each operating mode activity can be interrupted and restarted at any time without any extra cost. In this paper, minimizing the completion time along with maximizing the current net value of the project in the P-MRCPSP are considered. After solving the problem by using Epsilon limits method, according to NP-hard problem and multi-objective model, multi-objective particle swarm optimization (MOPSO) has been developed to achieve optimum scheduling. In order to evaluate the proposed methods efficiency, results have been compared to non-dominance genetic algorithm sorting (NSGAII) based on designed indicators. The Taguchi method has been used in experimental design, to adjust these two algorithms parameters. The results of the model solution show the strength of MOPSO algorithm.
Keywords:
Language:
Persian
Published:
Journal of Advances in Industrial Engineering, Volume:51 Issue: 1, 2017
Pages:
29 to 44
https://www.magiran.com/p1703610
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Designing a Causal Loop Model - the Causes of Natural Gas Fueled Vehicle Accidents with System Dynamics
Seyed Jamalaldin Razavinasab, Hamzeh Amin-Tahmasbi *
Journal of Transportation Research, -
Identifying and Prioritizing Effective Factors on Productivity of Manufacturing Industries: A Case Study of Pharmaceutical and Household Appliances Industries in Guilan Province
Hamzeh Amintahmasebi*, Neda Karimi, Mahdi Zarepour, Seyed Esmail Moghaddas
Journal of Productivity Management,