A Simulation-Based Optimization Model for Determining the Sequence of Implementing Projects Related To New Product Development
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Effective management of projects in research and development centers is one of the key objectives of these centers. Determining the optimal sequence of jobs affect the group productivity, earliness, and tardiness costs. One of the deterministic variants of the problem solving is well-known to be NP-Hard. If random elements are introduced into the problem, the level of complexity becomes higher. Hence, many priority rules have been developed to tackle stochastic job shop scheduling problem. However, to devise a better solution approach, simulation- optimization approach might be used. In this study, a mathematical model is developed for project scheduling with random process times and possible machine breakdowns. Then, a simulation-optimization model is designed to choose among a list of priority rules using Rockwell Arena 14. Finally, a numerical example was used to evaluate the quality of the model. Results show that the rule Longest Processing Time (LPT) yields the lowest total earliness and tardiness costs.
Keywords:
Language:
Persian
Published:
Journal of Modern Research in Decision Making, Volume:2 Issue: 4, 2018
Pages:
129 to 152
https://www.magiran.com/p1808960
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Designing a Robust Model for Budgeting on the Basis of the Performance of the Research Groups in Research and Development (R&D) Centers (Case Study: the Defensive R&D Center)
Zahra Nasresfahani *, Bejan Khayambashi,
Journal of Research in Budget and Finance, -
An Integrated Approach regarding Prioritizing Development Projects of New Defense Products
Sadeq Shahbazi, Seyyed Mojtaba Sajjadi *, Fariborz Joulai
Quarterly Defens Strategy,