A feasibility study of waste transportation through existing underground excavations in open pit Angouran mine
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Annual increasing depth in Angouran Lead & Zinc open pit mine, along with the technical, topographic and geomechanical limitation causes an increase in transportation costs and a reduction in efficiency. The existence of underground excavations in the high grade sulfurous zone promotes a research on the identification and analysis of applicable technical solutions for reducing the transportation costs in the open pit mining using existing underground excavation. For this purpose, at first, the existing underground excavation network was modeled using Micromine software. Then, the modelling of open pit ultimate pit limit was performed by Datamine & NPV scheduler softwares to determine the depth and the range of expansion of the cavity. By adapting this model with underground network, seven scenarios have been specified to to connect open pit limit and underground network. At the next step, superior scenarios were presented based on excavation tonnage, operating cost and construction duration criteria, in which scenario 6 was offered as the preferred scenario. In this scenario, the connection of pit limit and underground space was performed with 3 excavations. The first excavation is the inclined shaft connecting the upper tunnel to elevation 2840 for open pit waste material handling. At the next step, excavation of a drift from bench 2804 to middle of this shaft was performed. In order to get access to the lower elevations, an underground zigzag ramp ramified from the main ramp will connect to elevation 2768. The operation of this scenario brings aboutan improvement to the supplying of filling materials to the underground operating spaces.
Keywords:
Language:
Persian
Published:
Journal of Mineral Resources Engineering, Volume:2 Issue: 4, 2018
Pages:
25 to 38
https://www.magiran.com/p1847169
مقالات دیگری از این نویسنده (گان)
-
Analyzing the effects of natural ventilation caused by excavating the waste pass on the ventilation network of Anguran mine
Majid Fetri, *, Farhad Samimi Namin, Ebrahim Elahi Zeyni, MohamadHosein Khani Khereshki
International Journal of Mining & Geo-Engineering, Summer 2023 -
Application of GERT in Time Management of Tunnel Construction Projects
Hossein Maleki, Bijan Maleki *, Reza Shakoorshahabi
Journal of Mining Engineering,