Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new change point estimator is developed to find the real time of change in the indices mean. Furthermore, a new diagnosing method is presented to recognize the deviated mean index. The performance of the proposed methods is evaluated through simulation studies and an illustrative example.
Language:
English
Published:
Journal of Industrial and Systems Engineering, Volume:11 Issue: 2, Spring 2018
Pages:
85 to 100
https://www.magiran.com/p1877621  
سامانه نویسندگان
  • Author (3)
    Amirhossein Amiri
    Professor Industrial Engineering, Shahed University, Tehran, Iran
    Amiri، Amirhossein
اطلاعات نویسنده(گان) توسط ایشان ثبت و تکمیل شده‌است. برای مشاهده مشخصات و فهرست همه مطالب، صفحه رزومه را ببینید.
مقالات دیگری از این نویسنده (گان)