A Multi-Purpose Mathematical Model for Solving Multi-Mode Resource Constrained Project Scheduling Problem(M-RCPSP) and Environmental Effects:Augmented Ε-Constraint Method
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Oil, gas and petrochemical industry managers are nowadays preoccupied with finding ways of punctually completing projects while maintaining the highest implementational standards and minimizing financial costs and environmental threats. Reaching a balance among time, cost, quality and environmental effects is a paramount goal for these managers since these goals are contradictory and focus on any of them can lead to changes in the others. The purpose of this applied mathematical research was hence to design an authentic simulated multi-purpose mathematical model that can review and resolve the issue of project scheduling and balancing time, cost, quality and environmental effects in multi-mode projects. Using the GAMS software and CPLEX solver, the Model was validated through Expanded Epsilon Limitation Method and the analytical results of various sensitivities are reported.
Keywords:
Language:
Persian
Published:
Journal of Productivity Management, Volume:13 Issue: 50, 2019
Pages:
119 to 149
https://www.magiran.com/p2049355
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Spatial Modeling and Monitoring Electricity Consumption using Generalized Likelihood Ratio Control Chart
M. Khazaie Poul, H. Farughi *, Y. Samimi
International Journal of Engineering, Jul 2025 -
Design and Validation of a Model for Organizational Counterproductive Work Behaviors in Healthcare using A Mixed-Methods Approach
Somayyeh Ghaffari, *, Adel Salavati, Reza Shafei
Organizational Behavior Studies Quarterly, -
Qualitative Approach of Designing the Pattern of the Antecedents of Customer Forgiveness in the Banking Sector
Firoz Baharvandi, Roya Shakeri *, Heresh Soltananeh
Journal of Consumer Behavior Studies, -
Joint production and maintenance optimization for a single-machine deteriorating system in a finite planning horizon
Parviz Rahimi Kakehjoob, *, Hasan Rasay
Journal of Industrial Engineering and Management Studies, Summer-Autumn 2024