Project portfolio selection by considering triple-wise interaction among projects

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Purpose

The project portfolio problem proceeds to choose a subset among the proposed projects in organization. One of the purposes of project portfolio management is the reduction of the available risks in portfolio selection process. In real world, the project risks are rarely independent, and generally have a degree of interaction. By considering this interaction the more accurate evaluation of portfolio selection can be achieved. The purpose of this study is to provide a framework for selecting project portfolios by considering the triple interaction between projects for the first time using the correlation coefficient and the theory of cross-information for the risk factors affecting them.

Design/methodology/approach

 First, this research identifies the most critical risks based on the literature review, project management body of knowledge and the relevant experts' opinions. Then, a questionnaire was distributed among 30 experts to quantify the identified risk criteria. The identified risks that are included 11 risks are in the categories of “technical”, “external”, “organizational” and “project management”. Then theses risks are placed in to the “cost”, “time” and “quality” classification. By considering the individual project risk, the projects which their risks were higher than the allowable limit, were not able to compete in the portfolio. Also, the pairwise and triple-wise interaction of the projects based on effective criteria caused that the projects which provoke risks synergies in the portfolio to be prevented from being together. By analyzing risks, the pairwise interaction effects between projects are calculated using Spearman's correlation coefficient and for the first time the triple interaction effects between projects are calculated using theory of cross-information to discover more precisely the effect of factors on each other. Finally, the modeling in the form of a case study based on integer linear programming along with two goals, “maximize IRR” and “maximize the number of projects in the portfolio”, are accurately assessed to evaluate the research validity.

Findings

The problem of project portfolio is the selection of a subset of proposed projects according to the strategic goals of the organization and the associated constraints. This paper provides a framework for selecting project portfolios by considering the triple interaction between projects for the first time. The results show that considering pairwise and triple-wise interaction instead of individual pairwise interaction comprise different answers. This result leads to discovering the relationship which can not be identified just with the pairwise interaction.

Research limitations/implications

In this research the risk criteria are considered generally, while, in specific projects it can be used specific criteria. Using the meta-heuristic methods when the problem dimensions are increased is another area for future research. In addition, fuzzy methods and stochastic subject in order to quantify the risk criteria could be considered. Besides, this paper considers risks with negative aspect for project portfolio selection, while, in future research suggested that the risks with aspect of the positive are considered as well.

Practical implications

 One of the most important application of this paper is for project-oriented companies that are involved in doing multiple projects simultaneously. The results of this paper are useful for these companies for risk reduction in selecting and performing their projects.

Social implications

This paper considers the most important risks affecting project execution. These risks include external risks of organization as well as internal and technical risks of organization. So, the paper helps organizations for the most appropriate selection of projects that could have benefits for organization and also society.

Originality/value

 In the literature, there are various methods that researchers have considered for risk management. Most of these studies don’t consider interactions between projects or simply they considered only pairwise interaction. The main purpose of this study is to consider a higher level of interactions that is triple interactions that not considered in the literature. The results show that considering triple-wise interaction instead of individual pairwise interaction comprise different and better results.

Language:
Persian
Published:
journal of Production and Operations Management, Volume:11 Issue: 1, 2020
Pages:
1 to 22
magiran.com/p2161825  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!