Prioritize the Upgrading and Modernization Projects Using GIS And Methods Topsis(Case study: The third area of Sari city)
Worn tissues Pykrh cities are part of the value of the physical and performance status Urban renewal tissues could be trying to BhrhGyry PtansylHay of all existing and improving the components and functions with the aim of maximizing the BhrhVry cited. This study aimed to explore and analyze the problem better Distressed, Locating and mapping have been conducted and advice on upgrading. This method combines the descriptive statistics and analytical and And then the geometric correction techniques, enhancement and improvement of the Pan Band on the 2010 IRS satellite images in GIS, Range of specific urban locations with distressed areas requiring improvement were determined by visual interpretation and field observations. Ranking for evaluation and improvement plans for these areas Decision Model (Topsis) was used. Based on the findings of urban wear on the three, 28/32 %, respectively, compared to the rest of the region has the highest rate of exhaustion of the area. Was determined using Topsis Burnout status eroded areas in three cities in Surrey In this area, which is in fact the basic core region, the undesirable And has done so in priority development projects, and Then the area of 3, 2 and 1 respectively.
-
Investigation and Analysis of the Physical Development Pattern Of Izeh City in Dealing with Natural Hazard
Masoud Safaeepour *, Saeed Maleki, Sohrab Ghaedi, Azam Ebrahimi
Emergency Management, -
Geographical analysis of objective and subjective indicators of Dezful urban green space development with livability approach
Masoud Safaeepour *, Majid Goodarzi, Fazlullah Pajhwokc
Geographical Urban Planning Research,