Determining the Optimal Capacity and Location of the Tower Crane and Material Supply Point in Construction Sites Using Genetic Algorithm
Author(s):
Article Type:
Research/Original Article (بدون رتبه معتبر)
Abstract:
Construction site layout planning is one of the most important and essential early steps in construction management, which significantly influences project’s productivity. Since the tower crane is one of the key facilities on construction sites, optimized planning and managing its operation can improve construction performance. Determining optimal capacity and location of tower crane are complex combinatorial NP-hard optimization problems that are affected by several interrelated factors. This problem cannot be solved using exact mathematical methods on a large-scale site. Therefore, the use of metaheuristic algorithms is necessary in order to solve it. Tower crane’s location has a significant impact on its required capacity and, as a result, on total cost of material transportation, which was not considered in research for a long time. Recently, in a new research, tower crane’s capacity has been considered as a decision variable in the mathematical model. But the problem has been solved on a small-scale and with a precise method. Since the feasible solution space increases on a real-scale site, therefore, using the precise techniques is not practical to achieve the optimal solution. Therefore, it is necessary to utilize meta-heuristic algorithms to solve the problem. Using Genetic Algorithm, this study presents the optimal type and location of tower crane and material supply point as decision variables based on minimizing the total cost of material transportation on the large-scale site. The results indicate that the GA successfully determines the optimal solution, leading to approximately 14% cost reduction compared with when a site layout is decided based on experience.
Keywords:
Language:
Persian
Published:
Journal of Structural Engineering, Volume:19 Issue: 2, 2022
Pages:
48 to 64
https://www.magiran.com/p2477465
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Improving the Project Risk Management Process in Construction Projects by Provide a Suggested Method Based on PMBOK Standard and SHAMPU Model
Reza Mohajeri Borje Ghaleh, Towhid Pourrostam *, Naser Mansour Sharifloo, , Ebrahim Safa
Journal of Structural and Construction Engineering, -
Prioritize Mechanical, Electrical and Plumbing Elements in Clash Resolution Process from the Cost and Time Aspect by Fuzzy-AHP METHOD
Ali Hasannejad, Javad Majrouhi Sardrud*, AliAkbar Shirzadi Javid, MohammadHassan Ramesht, Tohid Purrostam
Journal of safe city,