Improving the Project Risk Management Process in Construction Projects by Provide a Suggested Method Based on PMBOK Standard and SHAMPU Model
Construction projects involve many groups with different goals, which each of them is exposed to many risks. In practice, different project stakeholders have different understandings of project risks. Each of which identifies and analyzes project risks without relying on a common methodology. For this reason, in most construction projects, discussing project risks and decision-making based on risk is a common problem that causes differences between project parties. Therefore, risk management in construction projects is a fundamental challenge. This research has been formed to improve the project risk management process with emphasis on construction projects; and use library resources, has investigated and compared the risk sub-processes in the models presented after 1990. By identifying the strengths and weaknesses of different models, a new method of risk management has been proposed. The proposed method consists of a combination of the PMBOK standard and the SHAMPU model and supports sub-processes that have received less attention in models, such as project definition, decision-making based on benefit/cost and Implementation Management. The addition of these sub-processes has been due to the specific nature of construction projects. These sub-processes can assess risks in more detail than existing models, and effectively help the project stakeholders to achieve a common understanding of risks in identifying and analyzing project risks.
-
کاربرد مدلسازی اطلاعات ساختمان (BIM) در مدیریت مصرف انرژی ساختمان مسکونی
سلمان ملکی، *، محسن جعفری ندوشن
نشریه مطالعات نوین برنامه ریزی شهری در جهان، زمستان 1403 -
Multi-period and multi-objective stock portfolio modeling considering cone constraints
Masoomeh Zeinalnezhad *, Zohreh Ebrahimi,
International Journal of Research in Industrial Engineering, Winter 2025 -
A hierarchical heuristic method to analysis of economics and safety of a pressurized water reactor in a power market
Ghafour Ahmad Khanbeigi, Naser Mansour sharifloo *, Gholamreza Jahanfarnia, Mohamad Kazem Sheikh-el-Eslami, Kaveh Karimi
Journal Of Industrial Engineering International, Winter 2023 -
Determining the Optimal Capacity and Location of the Tower Crane and Material Supply Point in Construction Sites Using Genetic Algorithm
Roya Amiri, *, Vahid Momenaei Kermani
Journal of Structural Engineering, -
Prioritize Mechanical, Electrical and Plumbing Elements in Clash Resolution Process from the Cost and Time Aspect by Fuzzy-AHP METHOD
Ali Hasannejad, Javad Majrouhi Sardrud*, AliAkbar Shirzadi Javid, MohammadHassan Ramesht, Tohid Purrostam
Journal of safe city, -
Reviewing Causes of Delay From the Risk Management Perspective in Execution Stage in Road Construction Projects (Case Study: Garmsar-Simin Dasht Road)
Reza Mohajeri Borje Ghaleh *, , Naser Mansour Sharifloo, , Ebrahim Safa
Civil Infrastructure Researches,