Flexible flow shop scheduling with forward and reverse flow under uncertainty using the red deer algorithm
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
This paper discusses the modeling and solution of a flexible flow shop scheduling problem with forward and reverse flow (FFSP-FR). The purpose of presenting this mathematical model is to achieve a suitable solution to reduce the completion time (Cmax) in forward flow (such as assembling parts to deliver jobs to the customer) and reverse flow (such as disassembling parts to reproduce parts). Other important decisions taken in this model are the optimal assignment of jobs to each machine in the forward and reverse flow and the sequence of processing jobs by each machine. Due to the uncertainty of the important parameters of the problem, the Fuzzy Jiménez method has been used. The results of the analysis with CPLEX solver show that with the increase in the uncertainty rate, due to the increase in the processing time, the Cmax in the forward and reverse flow has increased. GA, ICA and RDA algorithms have been used in the analysis of numerical examples with a larger size due to the inability of the CPLEX solver. These algorithms are highly efficient in achieving near-optimal solutions in a shorter time. Therefore, a suitable initial solution has been designed to solve the problem and the findings show that the ICA with an average of 273.37 has the best performance in achieving the near-optimal solution and the RDA with an average of 31.098 has performed the best in solving the problem. Also, the results of the T-Test statistical test with a confidence level of 95% show that there is no significant difference between the averages of the objective function index and the calculation time. As a result, the algorithms were prioritized using the TOPSIS method and the results showed that the RDA is the most efficient solution algorithm with a utility weight of 0.9959, and the GA and ICA are in the next ranks. Based on the findings, it can be said that industrial managers who have assembly and disassembly departments at the same time in their units can use the results of this research to minimize the maximum delivery time due to the reduction of costs and energy consumption, even though there are conditions of uncertainty
Keywords:
Language:
English
Published:
Journal of Industrial Engineering and Management Studies, Volume:10 Issue: 1, Winter-Spring 2023
Pages:
16 to 33
https://www.magiran.com/p2608771
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Conceptual Structuring of Strategic Alliance Forming Drivers With the TISM Method (Case Study: Inlaid Furniture Industry of Malayer City)
Mohammadjavad Azarshahi *, , Mirza Hassan Hosseini, Mohammadreza Mashayekh
Journal of International Business Management, -
A Comparative Study of the Resistive Economy Approach in the Economic Perspective of Islam and Conventional Economics
Soroosh Fayaz, , Reza Zabihi*
Resistance Economy Research Journal, -
Modeling the make-to-order problem considering the order queuing system under uncertainty
*, Maryam Rahmaty
International Journal of Industrial Engineering and Productional Research, Dec 2023 -
Investment Modeling to Study the Performance of Dynamic Networks of Insurance Companies in Iran
Javid Ghahremani-Nahr, *, Mohammad Ebrahim Sadeghi
Journal of Modern Research in Performance Evaluation,