Bi-objective Economic Production Quantity with Partial Backordering under Uncertainty
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
The economic production quantity (EPQ) model considers the production rate, demand rate, setup costs, holding costs, and shortage costs to find the production quantity that minimizes the sum of these costs. The goal is to balance the costs associated with production, holding inventory, and potential shortages. In this paper, two objectives include the costs of production and ordering and others in a separate objective function. In the objectives of the other costs, The cost of storage space as a supply is defined to be minimized. This study considers scrap and reworks in the EPQ model. This inventory model accounts for many items on a single machine. The production capacity is reduced, and there are shortages when only one machine exists. By determining the quantities of the products produced by the manufacturing facility, the storage space for each product, cycle time, and product scarcity, we can reduce both the overall cost and the supply cost of warehouse space due to non-linearity and the inability to solve commercial software in large dimensions, a multi-objective meta-heuristic algorithm, namely the non-dominated sorting genetic algorithm (NSGA-II), is used. The findings are further validated using the non-dominated ranking genetic algorithm (NRGA). Also, the obtained Pareto front is studied with several indicators. To perform these two algorithms at the best condition, we employed the Taguchi approach and related orthogonal arrays and performed algorithms for each array considering several factors. Also, to validate the mathematical model, we used the augmented epsilon-constraint method executed in the GAMS environment. It is clear that GAMS commercial software yields better results; however, these two algorithms are justifiable when the problem becomes bigger. Finally, by performing a sensitivity analysis for these indicators and the objective functions, the behavior of the proposed algorithms is compared and examined in detail. Also, the superior algorithm is chosen using the TOPSIS as a multi-criteria decision-making method. Numerical examples show how the presented model and the proposed algorithms may be used efficiently. A surveying literature review clarifies that the related objective functions, constraints, and solution approaches have not been investigated until now.
Keywords:
Language:
English
Published:
International Journal of Engineering, Volume:37 Issue: 7, Jul 2024
Pages:
1408 to 1421
https://www.magiran.com/p2702875
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Sustainable Multi-Objective Mathematical Modeling for Selecting a Technology Transfer Method in the Automotive Battery Industry
Amirhossein Latifian, Reza Tavakkoli-Moghaddam *, Masoud Latifian, Mahdi Kashani
journal of Production and Operations Management, Summer 2025 -
Integrated Multi-Model Risk Assessment of an Aging Gas Pipeline Using Fuzzy AHP and 3D Uncertainty Matrix
Arman Gholinezhad Paji*, Ali Borozgi Amiri,
Iranian Journal Of Operations Research, Summer and Autumn 2024