Using GERT to Model and Estimate the Success Probability of Stochastic Projects Under Rework

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

In practice, rework is a major threat to projects’ performance and increases the risk of not delivering the outcomes on time and on budget. The classical project scheduling methods are incapable in considering the rework and stochastic structure for projects in planning phase. The current study models the stochastic projects through a GERT network in which occurrence of rework is allowed. The aim is to find the optimal execution mode for each activity in a way that the project completes within a desire time and the resource constraint is satisfied. We develop a multi-mode time-cost trade-off resource constraint project scheduling problem under uncertainty to find a here-and now solution to minimize project completion time. The problem is solved using a combination of flow-graph theory, Mason’s rule and Monte-Carlo simulation method. To represent the efficiency of proposed solution methodology, a stochastic numerical experiment is generated and the obtained results show the capability of the solution method.

Language:
Persian
Published:
Journal of Industrial Engineering Research in Production Systems, Volume:12 Issue: 24, 2025
Pages:
35 to 47
https://www.magiran.com/p2811391  
سامانه نویسندگان
  • Fatemi Ghomi، Seyyed Mohammad Taghi
    Corresponding Author (2)
    Fatemi Ghomi, Seyyed Mohammad Taghi
    (1359) دکتری مهندسی صنایع، University of Bradford,England
اطلاعات نویسنده(گان) توسط ایشان ثبت و تکمیل شده‌است. برای مشاهده مشخصات و فهرست همه مطالب، صفحه رزومه را ببینید.
مقالات دیگری از این نویسنده (گان)