Identifying and classifying the critical risk factors in a power plant project in Iran
Abstract:
Large and complex infrastructure projects involve various risk factors and successful implementation of such project depends on effective management of the key risk factors. This paper reviews the literature to identify essential risk variables associated with infrastructure projects. Base of these risk variables and case studies of same projects, a survey is conducted to isolate and assess the critical risk factors for a Gas Turbine power plant project in Iran.49 items are extracted as critical risk factors and are classified to gain better understanding of their impact on the project.
Language:
Persian
Published:
Financial Research, Volume:9 Issue: 23, 2007
Page:
3
magiran.com/p562519
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!