Designing a Decision Support System (DSS) schema with Applying Genetic Algorithm for Survey of Resource Leveling Problem-(Vehicles)
Abstract:
Resource Leveling and Allocation are two basic categories for project management. The objective of resource allocation is to schedule activities so that a particular resource does not exceed a specific limit in any given project time period, while holding the project duration to a minimum. The Resource leveling problem arises when there are sufficient resources available and it is necessary to reduce the fluctuations in the pattern of resource usage. In this paper GA algorithm was used to solve the resource leveling problem which, in turn, is a multi objective and NP-hard problem. The solution was applied in coating section of Iranian Offshore Engineering Construction Company and the results were desirable. The results of research, which were obtained from the field survey, show genetic algorithm will solve this problem well and generate optimum or sufficiently enough solution.
Language:
Persian
Published:
Journal of Information Technology Management, Volume:1 Issue: 3, 2010
Page:
69
magiran.com/p701068
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!