Learning Curve Consideration in Makespan Computation Using Artificial Neural Network Approach

Author(s):
Message:
Abstract:
This paper presents an alternative method using artificial neural network (ANN) to develop a scheduling scheme which is used to determine the makespan or cycle time of a group of jobs going through a series of stages or workstations. The common conventional method uses mathematical programming techniques and presented in Gantt charts forms. The contribution of this paper is in three fold. Firstly, the learning curve which is characterized by a coefficient is considered in the computation work. Secondly, this work is limited to small number of jobs and is useful for project based pilot runs which involve learning. Lastly, the scheduling scheme is developed in ANN as an alternate method. Extensive and successful training using the input and output vector pairs were done to establish the proposed method. Comparison was done for the tested outputs and results produced seem reliable.
Language:
English
Published:
Journal of Industrial and Systems Engineering, Volume:4 Issue: 3, Autumn 2010
Page:
183
magiran.com/p859201  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!