Low-Cracking, High-Performance Concrete Bridge Decks Case Studies over First 6 Years

Message:
Abstract:
Cracks in concrete bridge decks provide easy access for water and deicing chemicals that shorten the life of the deck, and field surveys show that the problem has become progressively more severe since at least the 1980s. A two-phase, 10-year Pooled Fund study to minimize cracking in bridge decks is now under way. Twenty bridge decks have been constructed in the program to date. Comparison with conventional decks shows that the techniques embodied in low-cracking, high-performance concrete (LC-HPC) bridge deck specifications have been highly successful in reducing cracking in bridge decks. The results also show that high-slump high-strength concretes result in greater cracking in bridge decks than low-slump; moderate-strength concretes and that concrete temperature control and early application of curing counteract the negative effects of casting concrete under high-temperature conditions. Early owner and contractor buy-in is needed for successful LC-HPC bridge deck construction, and top performance requires the adherence to all aspects of the specifications.
Language:
Persian
Published:
Page:
23
magiran.com/p1072140  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!