The Solution of Multi - Objective Multimode Resource -Constrained Project Scheduling Problem with Multi -Objective Bees Metaheuristic Algorithm

Message:
Abstract:
Resource Constrained Project Scheduling Problem (RCPSP) is the most general scheduling problem. Job shop scheduling, flow shop scheduling and other scheduling problems are the subsets of RCPSP. The present paper examines the multimode multi-objective resource constrained project scheduling problem (RCPSP) with partial precedence relations. To enhance the practical aspects of this prominent problem, important practical purposes including minimizing the completion time of the project, maximizing the quality of project activities and minimizing the total cost of the project were considered. After validation of the model using the Bees Algorithm, the proposed multi-objective model was solved. The results obtained from the proposed model were compared with those obtained from NSGA-II. The results demonstrated the good performance of the proposed algorithm in solving RCPSPs.
Language:
Persian
Published:
Journal of Strategic Management in Industrial Systems, Volume:10 Issue: 34, 2016
Page:
1
https://www.magiran.com/p1563221  
سامانه نویسندگان
  • Sadeghi، Amir
    Corresponding Author (1)
    Sadeghi, Amir
    (1398) دکتری مدیریت تولید و عملیات، دانشگاه آزاد اسلامی واحد تهران جنوب
اطلاعات نویسنده(گان) توسط ایشان ثبت و تکمیل شده‌است. برای مشاهده مشخصات و فهرست همه مطالب، صفحه رزومه را ببینید.
مقالات دیگری از این نویسنده (گان)