The Solution of Multi - Objective Multimode Resource -Constrained Project Scheduling Problem with Multi -Objective Bees Metaheuristic Algorithm
Author(s):
Abstract:
Resource Constrained Project Scheduling Problem (RCPSP) is the most general scheduling problem. Job shop scheduling, flow shop scheduling and other scheduling problems are the subsets of RCPSP. The present paper examines the multimode multi-objective resource constrained project scheduling problem (RCPSP) with partial precedence relations. To enhance the practical aspects of this prominent problem, important practical purposes including minimizing the completion time of the project, maximizing the quality of project activities and minimizing the total cost of the project were considered. After validation of the model using the Bees Algorithm, the proposed multi-objective model was solved. The results obtained from the proposed model were compared with those obtained from NSGA-II. The results demonstrated the good performance of the proposed algorithm in solving RCPSPs.
Keywords:
Project scheduling , Resource constraints , Multi , objective , RCPSP , MOBEE algorithm , NSGA , II
Language:
Persian
Published:
Journal of Strategic Management in Industrial Systems, Volume:10 Issue: 34, 2016
Page:
1
https://www.magiran.com/p1563221
سامانه نویسندگان
مقالات دیگری از این نویسنده (گان)
-
Vehicle Routing Problem with a Time Window and Stochastic Demand and by Assuming a Competitor in Meeting the Customers' Demands
Behzad Ghasemi *, Ebrahim Mohammadipirlar,
Journal of Industrial Strategic Management, Summer-Autumn 2020 -
Designing a product-service supply chain performance evaluation model in the home appliance industry using factor analysis and fuzzy neural networks Case study: home appliance companies in Iran
, Adel Azar *, Changiz Valmohammadi, Abotorab Alirezaei
journal of Production and Operations Management,