Modeling Maintenance Scheduling Behavior of Power Units in Restructured Power Systems Based on Game Theory

Abstract:
Privatization of power sector and establishment of competition in power supplying process, raised unprecedented challenges in power system operation and planning fields, such as preventive maintenance scheduling which was formerly, in traditional environment, managed centrally by dispatching center. Dispatching center role having been changed in restructured power systems, power producing companies play a more important role in PM scheduling process. The conflict between dispatching center being concerned about power system reliability and stability, and power generating companies profit maximization based behavior which cannot be defined properly thorough traditional optimization theory, may be modeled satisfactory thorough Game theory approaches. In this paper, after modeling and solving PM scheduling process thorough game theory, discusses about resultant equilibrium states and predicts different power generation technologies behavior.
Language:
Persian
Published:
Iranian Electric Industry Journal of Quality and Productivity, Volume:6 Issue: 1, 2017
Pages:
1 to 7
magiran.com/p1735267  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!