Fuzzy Risk Assessment of Metro Station Construction (Case study: Karaj D2 Metro Station)

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Background And Objective
Growth of urban population contributes to many emerging problems including traffic, disturbances in the transportation system, air pollution and traffic accidents. In order to reduce these problems, it is possible to use rapid transportation systems and clean energy, such as rail transport systems (Metro), which can help to reduce traffic and also reduce air pollution and environmental pollution. On the other hand, with the remarkable development of our country in subway industry and its increasing necessity in large cities, transport systems (metro) have pushed industrialists and manufacturers towards such projects. This increases the number of metro and tunnel construction projects that may result in many incidents. The aim of this study is to investigate the hazards associated with metro station construction projects.
Method
In this applied research, an analytical descriptive method is used to investigate the hazards of constructing a metro station. In general, Fuzzy Risk Assessment (FRA) and Analytic Hierarchy Process (AHP) models are used for this purpose. The risk assessment process involves four general stages including: identifying, assessing, responding, and monitoring the risks. Regarding the problem of uncertainty in the field of risk management as well as the lack of information in this field, fuzzy risk assessment method was used and hierarchical analysis was applied to include the importance of component as compared to each other.
Findings: After evaluation, the results indicated that the aggregative risk of the project was almost equal to 50%, which confirms very high probability of occurrence and severity of the risks. Also, considering the dimensions of the risks and risk factors studied, it was found that the largest share of this number was related to the implementation of metro station access and the risk of debris falling during drilling.
Conclusion
In order to reduce the risks and incidents, these areas should be focused and appropriate preventive and control measures should be considered to ensure greater safety in such projects.
Language:
Persian
Published:
Journal of Environmental Sciences and Technology, Volume:19 Issue: 2, 2017
Pages:
191 to 201
magiran.com/p1804348  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!