Modeling and optimizing a multi-objective flow shop scheduling problem to minimize energy consumption, completion time and tardiness
Author(s):
Abstract:
Energy consumption considerations in production systems have recently attracted the attention of researchers. In conventional production scheduling models the importance has more often been given to time-related rather than to energy-related performance measures. In this paper we simultaneously consider energy consumption, completion time and tardiness in the presented Multi-Objective Mixed Integer Programming flow shop scheduling model. After validating the model by solving small-scale numerical examples with Weighted Sum and Epsilon-constraint method in GAMS, the large and medium-scale examples are solved via NSGA-II and SPEA-II metaheuristic-algorithms. The results proves the efficiency of the proposed algorithms.
Keywords:
Language:
Persian
Published:
Journal of Decisions and Operations Research, Volume:3 Issue: 3, 2018
Pages:
204 to 222
https://www.magiran.com/p1928397