Risk assessment with intervention of gas pipelines repair using FMEA method and determination of safety performance monitoring: a case for a gas and oil operating company in 2012-13

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Introduction

 work-related accidents impose irreparable hurt on the national capital. It is necessary to take a series of preventive measures before the occurrence to preserve and protect the human force and reduce accidents. The current study aimed to check safety contradiction using the FMEA method and determine protection indicators of safety performance in the overhaul project. 

Materials and Methods

 This study is descriptive-analytical research and an interference method that accomplished 13 jobs in major repairs gas pipeline project. After determining jobs and entering them in the FMEA worksheet, the initial risk score was obtained in this investigation, and after corrective suggestions, the secondary risk priority score was calculated.

Results

 The relationship between RPN1 and RPN2 was examined and determined a significant difference between risk priority score before and after corrective measure, and this indicates that these measures are effective (p<0.0005). Among various jobs and before taking corrective actions, the highest number of accidents was related to excavation activities with 15 accidents, which were reduced to 6 after taking corrective measures. Most days lost from work were related to driving job with 6020 days that reduced to 8 days after taking corrective actions; the highest rate of repeat accidents with 62.5 was related to détente activity reduced to 23.14 after taking corrective measures. The maximum intensity factor with 19444.44 was related to the driving activity reduced to 25.25 after taking corrective actions. The accident frequency - severity rate in driving activity with 15.84 was the most reduced to 0.28 after taking corrective measures. 

Conclusion

 Due to unacceptable risks and the high rate of accidents in the overhaul of the gas pipeline project, appropriate control measures can be used to reach an acceptable level of risk, which represents the usefulness of the FMEA method.

Language:
Persian
Published:
Occupational Medicine Quarterly Journal, Volume:12 Issue: 2, 2020
Pages:
59 to 68
magiran.com/p2181186  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!