Determining critical paths of projects by a new hybrid approach based on developed MULTIMOORA and SWARA methods under consideration of time, cost, quality, risk and safety criteria in an interval type-2 fuzzy environment
Critical path method is one of the most widely used approaches in planning and project control. Time is considered a determinative criterion for the critical path. But it seems necessary to regard other criteria in addition to time. Besides time criterion, effective criteria such as quality, cost, risk and safety are considered in this paper. Then, the developed problem is solved as a multi-attribute decision making problem by a new extension of MULTIMOORA method. Moreover, type-2 fuzzy sets are utilized for considering uncertainties. Type-2 fuzzy sets are more flexible and capable than type-1 fuzzy sets in reflecting uncertainties. Eventually, SWARA method is developed for determining the weights of efficient criteria such as time, cost, quality, risk and safety under type-2 fuzzy environment. Finally, an applied example has been solved to illustrate the calculations and the ability of the proposed approach. Based on the example, it is clear that the longest path in terms of time criterion is not a critical path, and other influential criteria are involved in determining the critical path.
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.