Capacitated Multi-Period Multi-Product Disassembly Scheduling with Parts Commonality and Partial Disassembly

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

In a green supply chain, preventing the disposal of used products and reusing them will help to protect the environment. The most important step in the closed-loop supply chain is the disassembly and recovery of used products and their reuse in producing new products. In this paper, we propose a new mixed-integer programming model to consider a multi-period multi-product disassembly scheduling problem based on parts commonality and partial disassembly. Considering partial disassembly is the main contribution of this paper. When the disassembly is partial, the parts with no demand will not disassemble; so, a lot of time and cost will be saved. The proposed model is solved using CPLEX Solver, and sensitivity analysis is deployed to validate the model and determine the proposed model's practical results. Numerical experiments shows that the CPLEX solver has a good efficiency for solving the developed model in small and medium dimensions.

Language:
Persian
Published:
Journal of Industrial Engineering Research in Production Systems, Volume:10 Issue: 21, 2023
Pages:
35 to 49
https://www.magiran.com/p2635244  
سامانه نویسندگان
  • Hasan Hosseini Nasab
    Author (3)
    Full Professor Yazd University, Industrial Engineering, Yazd University
    Hosseini Nasab، Hasan
  • Hassan Khademi
    Author (4)
    Full Professor industrial engineering, University of Yazd, Yazd, Iran
    Khademi، Hassan
اطلاعات نویسنده(گان) توسط ایشان ثبت و تکمیل شده‌است. برای مشاهده مشخصات و فهرست همه مطالب، صفحه رزومه را ببینید.
مقالات دیگری از این نویسنده (گان)